SAGAING DIVISION – According to Pale Township People’s Administration Body (PAB), help is needed to repair the Monywa-Pale-Gangaw road section in Monywa region, Sagaing division which was damaged due to the water erosion by the heavy rain.
After the heavy rain on August 22, around 130 feet from that road section was damaged due to the water erosion.
Mr. Zaw Htet from PPAB mentioned that “engineers suggested building the retaining walls for the long term besides repairing the road as it is a canyon on one side. So, it will cost around 30 million kyats in total.”
At the moment, financial support is needed to repair the road. So, for the people who would like to support can contact to PPAB, according to Mr. Zaw Htet.
He continued that the members of PPAB and People’s Defense Organisation (PDO) in Pale Township have constructed a temporary road which can even be used by trucks. But it is dangerous and it could also cause traffic blockage if the temporary road was also damaged due to the heavy rain.
That road section is important for the good transportation and travelling for Chin state, Sagaing division and Magway division.